Search For
Confirm
Cancel
LANGUAGE
G-TEK
中国
G-TEK
韩国
G-TEK
韩国
G-TEK
韩国
G-TEK
韩国
G-TEK
韩国
/
/
/
Nine matters needing attention in the use of measuring light curtain

NEWS

All categories

Nine matters needing attention in the use of measuring light curtain

  • Categories:INDUSTRY NEWS
  • Author:
  • Origin:
  • Time of issue:2021-08-18 10:04
  • Views:

(Summary description)What are the matters needing attention when using measuring light curtain? The following measuring light curtain manufacturers will take you to learn more about it.

Nine matters needing attention in the use of measuring light curtain

(Summary description)What are the matters needing attention when using measuring light curtain? The following measuring light curtain manufacturers will take you to learn more about it.

  • Categories:INDUSTRY NEWS
  • Author:
  • Origin:
  • Time of issue:2021-08-18 10:04
  • Views:
Information

What are the matters needing attention when using measuring light curtain? The following measuring light curtain manufacturers will take you to learn more about it.

customized measuring light curtain
9 matters needing attention when using measuring light curtain:
1. Cover the measuring light curtain by hand, and observe whether the indicator light transitions normally.
2. During the use of the photoelectric protection device of the punch press, the position of the photoelectric protection device shall not be changed at will.
3. In the protection zone, if the light curtain is blocked by hand, the machine should be able to stop working immediately.
4. When the slider is at the bottom dead center (180 degrees), the light curtain is blocked, and the machine tool slider should be able to return.
5. For presses that can only achieve top dead center protection, when the slider stops at the top dead center and the slider blocks the light curtain, the next operation cannot be started.
6. After changing the mold, the safety distance and position of the protection device must be adjusted by a special manager.
7. When disassembling the measuring light curtain and transmission line, the power should be turned off first, and it must be operated by professionals to avoid danger.
8. Check whether the transmitter and receiver of the measuring light curtain are accurately assembled with the respective cables, and whether the terminal of the cable is accurately connected to the power supply and the controller.
9. The measuring light curtain sensor is powered on, and the light curtain sensor starts self-checking, synchronization and self-calibration. After about 1 second, if the yellow indicator light of the transmitter is stable and all the indicators of the receiver are off, it means that the measuring light curtain sensor has entered. Normal working condition.

Keyword:

Scan the QR code to read on your phone

Online customer service
-

Customer service hotline :

13682005660

Copyright © 2019 Tianjin G-TEK sensor technology co..ltd       津ICP备19006465号-1       Powered By 300.cn